| 1. Laser saw placed on track to cut panels to specified length. |
|
2. Panels are blocked onto trailer bed in specific order for installation at job-site. |
|
3. 16” x 22” footing installed and ready. |
 |
|
 |
|
 |
| 4. Corners pinned and lines chalked.
Hard plastic shims in place as required. |
|
5. First panel swinging into place. |
|
6. Finished corner connection. |
 |
|
 |
|
 |
| 7. Installed walls are consistently straight, level, plumb and square. |
|
8. In just 45 minutes the crane is down!
Wall setting completed. |
|
9. Panels double-checked with laser level. |
 |
|
 |
|
 |
| 10. All voids are filled. All joints connected, & complete perimeter grouted. |
|
11. View of fireplace bump-out. |
|
12. Plumbing installed. |
| |
|
 |
|
|
| |
|
13. Slab completed. |
|
|